Legal
Terms of Sale
Terms covering quotations, orders, acceptance and inspection, intellectual property and confidentiality for custom ceramic component manufacturing.

Quotations
How quotations work
SCOPEA quotation applies to the drawing revision it references. If the drawing changes after the quotation is issued, the quotation is reviewed against the new revision.
VALIDITYQuotation validity is stated on the quotation itself. Where material price or availability changes materially, the quotation is reissued rather than applied unchanged.
ASSUMPTIONSWhere a requirement is ambiguous, the assumptions made are stated in the quotation. Those assumptions form part of the agreement.
What has to be agreed before production
- The drawing revision, frozen at order
- Material and grade
- Quantity and delivery schedule
- Inspection plan and sampling level
- Documentation set to be issued
- Packing and shipping requirements
How acceptance is settled
| Subject | Position |
|---|---|
| Standard of acceptance | The drawing revision and the agreed inspection plan |
| Measurement method | The method in the agreed plan is the reference method |
| Rejection | Notify with the measurement report and the method used |
| Resolution | Differences are investigated against a single agreed method before any commercial position is taken |
| Reporting window | State any requirement for a short notification window on the purchase order |
Who owns what
CUSTOMER DESIGNDrawings, models and designs supplied by the customer remain the customer’s property. They are used only to manufacture the order placed against them.
MANUFACTURING KNOWLEDGEProcess knowledge, routing and tooling practice developed by the manufacturer remain with the manufacturer.
Retention and disclosure
CONFIDENTIALITYCustomer files are treated as confidential and are not disclosed to third parties. An NDA is available on request and can be put in place before files are transferred.
Where the work is done


Frequently asked
No. It describes the commercial basis. Where a purchase order or a signed contract states different terms, that document prevails.
The method agreed in the inspection plan for the order. This is why the plan is agreed in writing before production starts.
By comparing datum scheme, instrument and measurement temperature first. Differences are almost always methodological.